CASE STUDY

Spratton C of E Primary School

Task: Design & Full Turnkey Installation

Client: Spratton C of E Primary School

Location: Spratton, Nothamptonshire

Spratton Church of England Primary School has been at the centre of the local community since 1819 when the church received a grant of land to build a school to accommodate 150 children.

Using our latest digital printing techniques, we bring ideas to life with endless possibilities.

This full turnkey installation incorporates WC cubicles complemented with concrete effect HSE compliant safety flooring. Accessories include tamperproof dispensers and our very own ‘Astronaut’ themed hand dryer. This range of hand dryers are a fun, efficient and stylish way to dry your hands whilst reducing your schools carbon footprint and are currently available in 4 characters .

 .

The toilet cubicles are manufactured in Solid Grade Laminate (SGL). SGL is an extremely durable, impact and scratch resistant material so will withstand heavy usage. This product is also impervious to water, meaning the toilet cubicles can be regularly and thoroughly cleaned, so that excellent hygiene standards are maintained therefore ideal to be used within a educational setting.

To complement the installation are shatterproof acrylic mirrors mounted on Upvc rigid extruded wall panelling in Linen. This product is manufactured from a high quality 2.5mm thick polymer sheet, which is impact resistant grout-free and meets all current EU directives on health and hygiene.

Our modular sink system in solid surface, frame balances an elegant, modern and minimalist aesthetic with the durability to withstand high-traffic environments. Frame sinks can be specified according to profile, depth, and height.

Previous
Previous

Peterborough Diocese Education Trust

Next
Next

Mayfield Secondary School